HENAN GNEE NEW MATERIAL CO., LTD
86-372-5055135
Contact Us
  • Contact Us
  • Tel: +86-372-5055135
  • Mob: +8615824687445
  • Email: sales@gneealu.com
  • Whatsapp: +86 15824687445
  • Add: No.4-1114, Beichen Building, Beicang Town, Beichen District, Tianjin, China

Precautions For Mthermal Insulation Aluminum Coils

Mar 22, 2024

The exquisite appearance and excellent quality of thermal insulation aluminum coils have become the first choice of users in many fields. Due to different uses, special attention is required when using them.

1. The ambient temperature for processing insulated aluminum coils should be above 7°C. The gap between the processing rollers should be adjusted according to the thickness, and foreign matter on the roller surface and the pallet should be removed. At the same time, check whether the paint on both sides is peeling off. If the paint is peeling off, The cause should be identified and measures taken before processing can continue.

Precautions for mthermal insulation aluminum coils

2. If it is to be put into use, it must be at a normal temperature. The temperature cannot be too hot or too cold. If it is used as a roof, the height must not be lower than 10 degrees.

3. Before installation, conduct a timely inspection to ensure that the roof material has no signs of wear, ensure that it can be used normally, and ensure the service life under normal circumstances.

4. The bolt heads that fix the thermal insulation aluminum coils should be sealed with a highly waterproof material to prevent rainwater from entering and causing rust.

Precautions for mthermal insulation aluminum coils

The exquisite surface quality of thermal insulation aluminum coils has become the focus of users in many fields. Due to different uses, special attention needs to be paid when using them. So, what are the precautions when applying thermal insulation aluminum coils?
First, if it is to be put into use, it must be at a normal temperature. The temperature cannot be too hot or too cold. If it is used as a roof, the height must not be lower than 10 degrees.
Second, before installation, conduct a timely inspection to ensure that the roof material has no signs of wear, ensure that it can be used normally, and ensure the service life under normal circumstances.
Third, the bolt heads that fix the thermal insulation aluminum coils should be sealed with a highly waterproof material to prevent rainwater from entering and causing rust.
Fourth, the ambient temperature of the thermal insulation aluminum coil processing should be above 7°C. The gap of the processing roller system should be adjusted according to the thickness of the thermal insulation aluminum coil, and foreign matter on the roller surface and the pallet should be checked; at the same time, check whether both sides of the thermal insulation aluminum coil are peeling off. If the paint peels off, the cause should be identified and measures taken before processing can continue.
To ensure the construction quality of thermal insulation aluminum coils, installation must be strictly carried out in accordance with the above conditions.